← Heatmap / GLM 5.3 Flash · Task 32
GLM 5.3 Flash · Single-turn · Task 32 (Traps, month not covered)
Mean 100.0%
| Field | Expected | Rollout #1 (100%) | Rollout #2 (100%) | Rollout #3 (100%) |
|---|---|---|---|---|
| decision | clarify | clarify | clarify | clarify |
| reason code | NO_APPLICABLE_REFERENCE | NO_APPLICABLE_REFERENCE | NO_APPLICABLE_REFERENCE | NO_APPLICABLE_REFERENCE |
| clauses | R1 R7 | R1 R7 | R1 R7 | R1 R7 |
Prompt
Process this monthly payroll record under the supplied rulebook. Return the R6 or R7 JSON answer.
Source documents: {"efa5f8e964c98c5c-payroll": {"kind": "payroll", "record": {"gross_pay": "7777.07", "payroll_month": "2025-08", "allowed_deduction": "12.47"}}}
Authoritative case reference schedule: {"first-half": {"rate": "0.07", "cap": "4000.00", "deduction": "400.00", "free": "1200.00", "upper": "3300.00", "middle_rate": "0.08", "upper_rate": "0.24"}, "second-half": {"rate": "0.05", "cap": "3500.00", "deduction": "400.00", "free": "1000.00", "upper": "3600.00", "middle_rate": "0.08", "upper_rate": "0.18"}}
Rollouts
Rollout #1 100.0% passed · 5.8s · $0.0006
| Component | Score | Clauses |
|---|---|---|
| decision | 100.0% | R1 R7 |
| exact | 100.0% | R1 R7 |
| field accuracy | 100.0% | R1 R7 |
| citations | 100.0% | R1 R7 |
| explanation | 100.0% | R1 R7 |
Assistant
{
"decision": "clarify",
"reason_code": "NO_APPLICABLE_REFERENCE",
"clauses": ["R1", "R7"],
"explanation": "The payroll month is 2025-08, which has no applicable reference row because only 2026 (first-half 2026-01 through 2026-06 and second-half 2026-07 through 2026-12) is covered; the case schedule does not extend to 2025 and an old row must not be extrapolated. Please provide a payroll month covered by the reference tables to allow calculation."
}
Reasoning
Let me analyze this payroll record.
Input: gross_pay = "7777.07", payroll_month = "2025-08", allowed_deduction = "12.47".
The payroll month is 2025-08, which is NOT in 2026. Per R1, only 2026 is covered. Dates outside 2026 require clarification under R7.
Check R7 order:
1. Missing gross_pay? No, present.
2. Missing payroll_month? No, present ("2025-08").
3. A month without a reference row: 2025-08 has no reference row (only 2026 is covered). Return clarify with reason_code "NO_APPLICABLE_REFERENCE", citing R1 and R7.
Note: The case reference schedule exists, but it's for first-half and second-half of 2026 presumably — actually the schedule doesn't specify periods; but R1 says "Select the reference row below using the payroll month" and only 2026 is covered. The schedule replaces defaults for the case, but the period boundaries stay the same (first-half = 2026-01 through 2026-06, second-half = 2026-07 through 2026-12). 2025-08 is outside both periods. So NO_APPLICABLE_REFERENCE.
Also note R7 item 3: "Do not extrapolate an old row."
Also, R4 says "When the month or applicable row is absent, accept structurally valid deductions up to 350.00 for task validation, but do not calculate a payslip or assume a reference row." Here deduction is 12.47, which is ≤ 350.00, structurally valid. So no dataset error; we clarify.
Answer: clarify, reason_code NO_APPLICABLE_REFERENCE, clauses ["R1", "R7"]. Include short explanation naming the unresolved blocker and asking for resolution.
Format: one JSON object, no markdown fences. Allowed fields for clarify: decision, reason_code, clauses. Optional explanation.
Output:
{"decision": "clarify", "reason_code": "NO_APPLICABLE_REFERENCE", "clauses": ["R1", "R7"], "explanation": "The payroll month 2025-08 is outside 2026, so no reference row applies and the payslip cannot be calculated without a covered month. Please supply a payroll month covered by the reference tables."}
Rollout #2 100.0% passed · 5.5s · $0.0004
| Component | Score | Clauses |
|---|---|---|
| decision | 100.0% | R1 R7 |
| exact | 100.0% | R1 R7 |
| field accuracy | 100.0% | R1 R7 |
| citations | 100.0% | R1 R7 |
| explanation | 100.0% | R1 R7 |
Assistant
{
"decision": "clarify",
"reason_code": "NO_APPLICABLE_REFERENCE",
"clauses": ["R1", "R7"],
"explanation": "The blocker is that payroll_month 2025-08 falls outside 2026, the only year covered by the reference rows (first-half/second-half both apply to 2026 months), so no applicable reference row exists for this pay period and no payslip can be calculated. Resolve by supplying a payroll month in 2026 so a reference row applies."
}
Reasoning
Let me analyze this payroll record.
The payroll record has:
- gross_pay: "7777.07"
- payroll_month: "2025-08"
- allowed_deduction: "12.47"
The payroll month is 2025-08. According to R1, only 2026 is covered. 2025-08 is outside this range, so under R7 rule 3, a month without a reference row requires clarification with reason_code "NO_APPLICABLE_REFERENCE", citing R1 and R7.
The reference schedule supplied only covers "first-half" and "second-half" of 2026 (first-half: 2026-01 through 2026-06, second-half: 2026-07 through 2026-12). 2025-08 falls outside.
Wait — also, per R7 item 2, missing payroll_month check comes before. payroll_month is present. Then item 3: a month without a reference row → clarify NO_APPLICABLE_REFERENCE.
Also allowed_deduction of 12.47 is structurally valid and under 350.00, but R4 says "When the month or applicable row is absent, accept structurally valid deductions up to 350.00 for task validation, but do not calculate a payslip or assume a reference row." So we don't calculate.
Answer: decision: "clarify", reason_code: "NO_APPLICABLE_REFERENCE", clauses: ["R1", "R7"], plus a short explanation naming the unresolved blocker and asking for its resolution.
The clarification schema: decision, reason_code, clauses. Optional explanation string is permitted. For clarification include a short explanation naming the unresolved blocker and asking for its resolution.
So the JSON:
{
"decision": "clarify",
"reason_code": "NO_APPLICABLE_REFERENCE",
"clauses": ["R1", "R7"],
"explanation": "The payroll month 2025-08 is outside 2026, the only period covered by the reference rows, so no applicable reference row exists. Provide a payroll month within 2026 (or a covering reference row) so the calculation can proceed."
}
Rollout #3 100.0% passed · 7.3s · $0.0004
| Component | Score | Clauses |
|---|---|---|
| decision | 100.0% | R1 R7 |
| exact | 100.0% | R1 R7 |
| field accuracy | 100.0% | R1 R7 |
| citations | 100.0% | R1 R7 |
| explanation | 100.0% | R1 R7 |
Assistant
{
"decision": "clarify",
"reason_code": "NO_APPLICABLE_REFERENCE",
"clauses": ["R1", "R7"],
"explanation": "The payroll month 2025-08 has no applicable reference row: only 2026 months are covered (first-half and second-half), and out-of-range dates cannot use an old row or extrapolation. Please supply a payroll month within 2026 so the payroll can be calculated."
}
Reasoning
Let me analyze this task.
The payroll record:
- gross_pay: "7777.07"
- payroll_month: "2025-08"
- allowed_deduction: "12.47"
The payroll month is 2025-08. Per R1, only 2026 is covered. Dates outside 2026 require clarification under R7.
Check order per R7:
1. Missing gross_pay? No, it's present.
2. Missing payroll_month? No, it's present.
3. A month without a reference row: 2025-08 is not covered (only 2026 rows). So return clarify with reason_code "NO_APPLICABLE_REFERENCE", citing R1 and R7.
The case reference schedule is supplied but only covers first-half and second-half 2026 periods presumably (the meanings and period boundaries stay the same — i.e., first-half = Jan through June, second-half = July through Dec). But the year must be 2026 anyway. 2025-08 is outside 2026, so no applicable reference row.
So the answer is:
{
"decision": "clarify",
"reason_code": "NO_APPLICABLE_REFERENCE",
"clauses": ["R1", "R7"],
optional explanation
}
Note: R7 says "When the month or applicable row is absent, accept structurally valid deductions up to 350.00 for task validation, but do not calculate a payslip or assume a reference row." The deduction 12.47 is structurally valid anyway. But we don't calculate.
Wait — also note R7 point 4 about contract_gross_pay conflict — not present here.
So clarify with NO_APPLICABLE_REFERENCE.
Also the case schedule: even if supplied, the payroll month isn't in 2026. The schedule's period boundaries stay the same (first-half 2026-01 through 2026-06, second-half 2026-07 through 2026-12). So 2025-08 has no row.
Output format: JSON object, no markdown fences, no prose. Allowed fields for clarify: decision, reason_code, clauses. Optional explanation string permitted.
Explanation should name unresolved blocker and ask for resolution. Something like: "The payroll month 2025-08 has no applicable reference row; only 2026 months are covered. Provide a payroll month within 2026 to proceed."
Citations: R1 and R7.